SNRIPlan was dedicated to scheduling and managing
industrial workshops. Using product routing, bills of
materials and definitions of resource availability,
SNRIPlan automatically generated an accurate plan for
orders added to a production plan. Each task was planned
based on the specific set of resources defined in the
product routing. Scheduling was established according to
stocks and procurement lead times of raw materials,
availability of machines and operators' working hours.
SNRIPlan modified the production plan to match such
realities as breakdowns of machines or tools or delay in
delivery of raw materials. This allowed a manager know each
modification as soon as possible.
SNRIPlan also included simulation functions that were a
real help in making strategic decisions. By simulating
changes in plant configuration-such as product routing,
working hours, extra operators, or purchase of machines-the
manager immediately saw the results of various decisions on
the production plan. SNRIPlan generated documents at order
release and gave statistics or synthetics analysis. The
automatically generated plan could be manually modified.
SNRIPlan could be linked with an existing manufacturing
management application and production control plan.